The Mission Bay Neighborhood, on the south side of San Francisco, is being transformed from an industrial, relatively undeveloped area, into a mecca for biotechnology, including research and hospital facilities for UC San Francisco, Bayer, Nectar, Gladstone Institute, and Sales Force, as well as a new, livable urban neighborhood, with multiple sets of linked parks.

Alta is part of the integrated project team installing the new infrastructure and parks, providing project and construction managers, engineers, field inspectors, civil, electrical and mechanical inspectors, estimators, schedulers, and other technical support services as needed.   Parks P10, P16 and P17 are the most recent projects completed by Alta as the owner’s rep/ CM responsible for cost estimating, bid and procurement, contract administration and CM/Inspection.  Parks P16 & 17 incorporate extensive hardscape features, benches and open lawn areas for active use by local residents and pets.  Park P10 is a passive landscape within roadway median and round-about islands incorporating bioswales and low maintenance plantings.  In addition to these completed parks, Alta is currently providing budget updates/estimates and bid packages for multiple park projects which include play structures and other specialized equipment.

 

Page 2 of 3123

 

66” Diameter Force Main
Construction Cost.   –   $5,500.000.

………………….

Blocks 41-43, Phase II.  Infrastructure.
Construction Cost.   –   $10,000.000.

………………….

Storm Water Pump Station, Wet Well and CDS unit.
Construction Cost.   –   $6,000.000.

………………….

Sanitary Sewer Pump Station
Construction Cost.   -   $3,500.000

………………….

Residential Blocks 2-13
Construction Cost.   -   $25,000.000.

Blocks N4, N4A & N5 
Construction Cost.   -   $17,000.000

………………….

Blocks 26-28, Phase II. Infrastructure.
Construction Cost.   -    $2,000,000.

………………….

Park P17. Parks Infrastructure.
Construction Cost.   -   $1,000,000.

………………….

Park-Maintenance Building.  Vertical Structure
Construction Cost.   -   $2,000,000.

………………….

Procurement of Owner Supplied Street Lighting and Poles.
Management Cost.   -   $500,000.